Site visit at Suite 203. Tone and trace network ports. Traced network ports to patch panel in server room. Connected network cables to switch in server room. confirmed network connection is up to GSC network.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
Site visit at Suite 203. Tone and trace network ports. Traced network ports to patch panel in server room. Connected network cables to switch in server room. confirmed network connection is up to GSC network. |
Kevin Hsueh
|
03/11/2022 01:46 pm |
03/11/2022 02:35 pm |
00:49
|