Tone and trace network port at the Varian desk. Confirmed network port tones to patch panel port 12. Reconnect network switches to power outlet. Confirmed all network switches booted up and fiber link to GSC server room is up and active. Test network connection at varian desk and confirmed network is accessible.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
Tone and trace network port at the Varian desk. Confirmed network port tones to patch panel port 12. Reconnect network switches to power outlet. Confirmed all network switches booted up and fiber link to GSC server room is up and active. Test network connection at varian desk and confirmed network is accessible. |
Kevin Hsueh
|
12/01/2023 02:00 pm |
12/01/2023 02:47 pm |
00:47
|