Install the following items at UOG School of Engineering building. UOG staff will move the boxes to the 2nd floor.
1st Floor:
75" Panel: Concrete wall mounted with Backups
2nd Floor:
75" Panel: Concrete wall-mounted with Backups
86" Panel: Mobile Stand with Backups and Logitech Webcam and Owl Labs camera.
POC: Jonathan Nguyen
Contact: (Office) 671-735-0318 or (Cell) 671-777-4268
Work Requested by: Jonathan Nguyen