Install Promethean V10 86”, motorized stand and backups at UOG School of Engineering Building, 2nd floor conference room. Unmount one existing Promethean V10 75” (PO#BR250406) that was originally wall-mounted on the 2nd floor and place it on the second motorized stand.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
Install Promethean V10 86”, motorized stand and backups at UOG School of Engineering Building, 2nd floor conference room. Unmount one existing Promethean V10 75” (PO#BR250406) that was originally wall-mounted on the 2nd floor and place it on the second motorized stand. |
Kevin Hsueh
|
03/20/2026 09:00 am |
03/20/2026 11:00 am |
02:00
|