- Mounted 1 Power Strip to connect both Maglock and Network Switch.
- Ran 1 network cable from the switch to the copier room.
- Ran another network cable from the switch to the AC12.
- Mounted the Verkada Camera and connected the network cable at the copier room.
- Verified camera is able to boot.
|
|
Work Completed |
Technician |
Check-in |
Check-out |
Actual Hrs |
|
|
1 |
- Mounted 1 Power Strip to connect both Maglock and Network Switch.
- Ran 1 network cable from the switch to the copier room.
- Ran another network cable from the switch to the AC12.
- Mounted the Verkada Camera and connected the network cable at the copier room.
- Verified camera is able to boot. |
Sean Bacani
|
05/18/2026 08:50 am |
05/18/2026 11:10 am |
02:20
|